This project involved converting the back third of a garage into a laundry/utility room.

The work was completed in less than a week and I'm sure you agree from the first picture to the last the change was quite significant!

 

The garage was bare brick with open joists and plywood roof.  We have lined the walls with Gypliner to create a cavity and ran a standard 50mm stud wall to divide to the garage.

 

The garage sat a fair distance from the house so we had to dig a track (the hardest bit!) and lay some hdpe pipe below ground to the desired entry point of the garage.

 

The plasterboard is now up and the ancient strip light has been demounted from the ceiling, we have also boxed and faced the door frame back to the plasterboard also at this stage.

 

All joints have now been taped and filled and the skirting is on also - the baton for the suspended ceiling is also on...time to hide that ugly ceiling!

 

Floor is now in, walls sanded and painted, suspended ceiling and spot lights installed (we chose a suspended ceiling as the garage has a flat roof and if there is any water ingress in the future access will be quick and easy). Pipework is now place also and sink and worktops in place - little bit still to go but..

 

 

That's it all but done now...got the washing machine plumbed in and tiled splash back is now in also.  Dunno who walked across the wall but....?

 

 

  CONTACT INFORMATION:

 

  Postal Address:

  GCS property services

  Unit 14 Queenslie Point

  Queenslie Ind Estate

  Glasgow

  G33 3NQ

 

  Tel. 0141 774 8600

  Fax.0141 774 8601

  Email. info@gcs.gb.com

 

 

   

                                                             © GCS property services 2005