Clean Room
Refurbishment - East Kilbride
Summary
The client was
looking to take an area where a very basic clean room 'step
over' set up was in operation and create an area more
professionally designed for the requirements of the company.
This project was
carried out over a five day period, the area was pretty tight
so pictures couldn't really capture the end result - basically
the job involved the following:
4 x New Powder
Coated Doors and Frames Supplies and Fitted
2 x New Walls
installed (accommodating two of the new doors)
2 x Doorway's
removed and returned to walls
1 x Wall opened up
to accommodate one of the new doors
A new 2mm Polyflor
XL supplied and fitted
2 x Step Over
benched supplied and installed
3 x Walls Removed

New wall and door
with new step over bench at bottom of image

New step over
bench and vinyl floor, we took the vinyl up the bench on
either side, covered it in formica and put a top cover on it
with upstand at either side.

This is another
new door from the opposite end, this is also a new wall, to
the left of this was a doorway which we returned to a wall
also..

Side on view of
the step over bench and new vinyl floor
|